APSAgent Promoter Score Standard Home

APS documentationAPS-1.0

Cite APS-1.0
Was this helpful?
On this page

Governance of the APS standard

APS-1.0Status: Bodies being formedMaintained by The Prompt Group

A standard is only as good as its rules. APS is maintained in the open: changes are proposed, consulted on and versioned, so a score published this year compares with one published next year.

Principles

PrincipleWhat it means in practice
Open methodPillars, rubric and weights are published in full.
IndependenceScores are never adjusted for clients.
ComparabilityEvery score states the version that produced it.
ConsultationMaterial changes are published for comment before they take effect.

Who maintains APS

BodyRoleStatus
Standards councilApproves new versions of the standard.Seats open
Methodology committeeDrafts and tests changes to the method.The Prompt Group
Public consultationAnyone can comment on a draft before it is adopted.Open on APS-1.0
CorrectionsReviews reported errors in published scores.Process published below

How the standard changes

  1. Proposal

    A change to the method, weights or reporting rules is written up with its reasons.

  2. Testing

    The methodology committee tests the change against stored answers and publishes the effect on scores.

  3. Public consultation

    The draft is published for comment. Material changes are never adopted without it.

  4. Approval

    The standards council approves the final text.

  5. Release

    The change ships under a new version number, with its date and a summary of what changed.

Versions and comparability

Every published score names the version that produced it. Scores compare directly only when they come from the same version, because the version fixes the pillars, formulas and weights.

VersionWhat it coversStatus
APS-1.xPillar IV method and its entry into the score.In development
APS-1.0Pillars I to III scored, the 0 to 100 composite and reporting rules.Consultation
—Pillars first defined in The Delegation Curve.Published

Independence

The method is the same for every company measured. No company can buy a different method, a different set of engines for its published score, or a change to a score after it is computed.

  • Scores are never changed by hand.
  • Question sets are fixed before answers are collected.
  • Every score travels with its evidence: pillar scores, version, engines, answer count and window.

Corrections

If a published score appears to contain an error, report the question, the engine and the collection date. The stored answer is checked against the record, and any correction is published with the score and the reason for the change.

Public consultation

APS-1.0 is open for comment. The consultation covers the pillar weights, the minimum evidence for each pillar, the reporting requirements and the arrangements on this page.

On this page